Heavy lift shipping, planned lift by lift.
Pieces from 20 tonnes to more than 250 tonnes, moved by sea from factory floor to final site.
Pieces from 20 tonnes to more than 250 tonnes, moved by sea from factory floor to final site.
With heavy pieces, every lift is a risk: at the factory, onto the trailer, at the port, onto the ship and off again. Missing lifting points, an off-centre load or a low warehouse roof can change the whole plan.
We survey the cargo first, then build the plan around it, working with specialist crane, haulage and port partners.

250-tonne press, Sheffield to Houston. No lifting points, an off-centre load and a warehouse roof too low for a direct lift, so we built the lift sequence from scratch.
100-tonne reel to Port Fourchon. Discharged straight from ship to barge, because the road could not carry the weight.
18 machines, Dubai to Lagos. Pieces of 28 to 50 tonnes, with our team aboard for 14 hours to oversee loading and securing.
What do you need from me to quote? Length, width, height and weight of each piece, the lifting points if there are any, the collection and delivery addresses, and when it needs to arrive. Photos help a lot.
Do you supply the cranes and trucks? We plan and manage the job and bring in specialist crane, heavy haulage and port partners for each lift.
What if my cargo has no lifting points? It can still be moved. We plan the lift around the piece, using stools, slings or trailer manoeuvres, as on our 250-tonne press.
Send the dimensions, weights, origin and destination, and a project specialist will come back to you directly. Or call 0333 038 4059.